
我們的科技建設與同業的對比

Our Infrastructure vs. Competition
Our Infrastructure vs. Competition
Service Layers | Competition | in-essence TM v4.1 |
| | |
| Programming Framework | | LAMP ASP .NET J2EE Ruby-on-Rails
|
| Server Services | | Apache / IIS / Tomcat Server Qmail / SendMail / Exchange / Lotus Notes Mail Server MySQL / MSSQL / MSAccess / Postgres Server LDAP/Active Directory Replications on Database Servers E-mail Server Fail-over configuration
|
| Operating System Platform | Linux and Windows Servers with no official support directly from OS developers.
| Linux with direct Redhat Official Support Windows Servers with direct Microsoft Official Support Testings done of various configurations and design.
|
| Hardware Configuration | | Minimum RAID 1 Configured servers Different batch of hard disk 1 Hr Hardware Replacement All Server Hardware or network Equipment will be expired and refreshed after 36 months. All hardware passed load testing and 24 hrs heavy run test. Annual Hardware servicing and maintenance Intelligent Performance Module Included Managed Backup Server
|
| Network Connectivity | | Multiple Upstream Providers Asia Peering Speed or Traffic Billing options Monitored 24 x 7 Scheduled cable testing for erosion prevention and maintain performance 100Mbps directly to Internet Exchange
|
| Data Centre | | Multiple layers Power Redundancy A-B Power source configuration available Only certified approved server grade power boxes allowed Temperature level monitored for every equipment to ensure maximum hardware performance No Co-location services provided for maximum security.
|

© 2008 ReadySpace Ltd. All rights reserved.